What gets missed before mitigation
- Wall-cavity moisture and mold
- Subfloor damage
- HVAC contamination
- Electrical corrosion
- Insulation replacement
- Framing damage
The right sequence
- Emergency mitigation (tarp, extract, dry)
- Demolition to expose hidden damage
- Full scope assessment with all damage visible
- Then negotiate and settle

If you've already settled
Supplemental claim under Fla. Stat. 627.70132 within the 18-month window.

